Note: The Gold Coast Planning Scheme 2003 Version 1.2 Amended January 2010 is now a superseded Planning Scheme but is still available for viewing.
To view the current version of the Gold Coast Planning Scheme 2003, go to www.goldcoastcity.com.au/planningscheme.
Documents
- About Our Living City - Gold Coast Planning Scheme 2003
- Contents
- Part 1 – Introduction
- Part 2 – Desired Environmental Outcomes and Performance Indicators
- Part 3 – Planning Strategy
- Part 4 – Definitions
- Part 5 – Domains
- Part 6 – Local Area Plans
- Part 7 – Codes
- Part 8 – Infrastructure
- Part 9 – List of Planning Scheme Maps
- Part 10 – Schedules
- Appendix 1
About Our Living City – Gold Coast Planning Scheme 2003
Contents
- Contents (
105kb)
Part 1 Introduction
- Division 1: Context (
132kb) - Division 2: Towards Ecological Sustainability (
186kb)
Part 2 Desired Environmental Outcomes and Performance Indicators
- Division 1: Desired Environmental Outcomes (
216kb) - Division 2: Performance Indicators (
109kb)
Part 3 Planning Strategy
- Division 1: Purpose of the Planning Strategy (
92kb) - Division 2: Key Strategies (
520kb) - Division 3: Land Use Themes (
259kb)
Part 4 Definitions
- Division 1: Dictionary of Terms used in the Gold Coast Planning Scheme 2003 (
338kb)
Part 5 Domains
- Division 1: Introduction to Domains (
159kb) - Division 2: Domains
| Rural | ( | |
| Park Living | ( | |
| Village (Mixed Use) | ( | |
| Detached Dwelling | ( | |
| Residential Choice | ( | |
| Tourist and Residential | ( | |
| Integrated Business | ( | |
| Local Business | ( | |
| Fringe Business | ( | |
| Industry 1 (High Impact) | ( | |
| Industry 2 (Low Impact) | ( | |
| Extractive Industry | ( | |
| Marine Industry | ( | |
| Community Purposes | ( | |
| Conservation | ( | |
| Private Open Space | ( | |
| Public Open Space | ( | |
| Emerging Communities | ( | maps |
Part 6 Local Area Plans
- Division 1: Introduction to Local Area Plans (
355kb) - Division 2: Local Area Plans
| Beenleigh Town Centre | ( | maps |
| Broadbeach | ( | maps |
| Bundall Central | ( | maps |
| Bundall Equestrian | ( | maps |
| Burleigh | ( | maps |
| Burleigh Ridge | ( | maps |
| Chevron Island | ( | maps |
| Coolangatta | ( | maps |
| Coomera | ( | maps |
| Coomera Town Centre | ( | maps |
| Currumbin Hill | ( | maps |
| Eagleby | ( | maps |
| East Coomera/Yawalpah Conservation | ( | maps |
| Guragunbah | ( | maps |
| Helensvale Town Centre | ( | maps |
| Hope Island | ( | maps |
| Mudgeeraba Village | ( | maps |
| Nerang | ( | maps |
| Oxenford | ( | maps |
| Palm Beach | ( | maps |
| Paradise Point | ( | maps |
| Robina | ( | maps |
| South Stradbroke | ( | maps |
| Southport | ( | maps |
| Springbrook | ( | maps |
| Surfers Paradise | ( | maps |
| The Spit – Gold Coast Harbour | ( | maps |
| Uplands Drive and Woodlands Way | ( | maps |
| West Burleigh Township | ( | maps |
| Yatala Enterprise Area | ( | maps |
Part 7 Codes
- Division 1: Introduction to Codes (
202kb) - Division 2: Specific Development Codes
- Division 3: Constraint Codes
| Gold Coast Airport and Aviation Facilities | ( |
| Bushfire Management Areas | ( |
| Canals and Waterways | ( |
| Car Parking, Access and Transport Integration |
( |
| Cultural Heritage (Historic) | ( |
| Cultural Heritage (Indigenous) | ( |
| Dam Catchment Areas | ( |
| Flood Affected Areas | ( |
| Natural Wetland Areas and Natural Waterways | ( |
| Nature Conservation | ( |
| Ocean Front Land | ( |
| Rail Corridor Environs | ( |
| Road Traffic Noise Management | ( |
| Sediment and Erosion Control | ( |
| Service Roads (Pacific Motorway) | ( |
| Steep Slopes or Unstable Soils | ( |
| Unsewered Land | ( |
Part 8 Infrastructure
-
Division 1: Priority Infrastructure Plan (PIP) (
1.02mb)maps Division 2: Infrastructure Charges Schedule (
3.98mb)Division 3: Reference Documentation (
104kb)
Temporary Local Planning Instrument No. 1 (Infrastructure Charges and Contributions) 2009
Part 9 List of the Gold Coast Planning Scheme 2003 Maps
- Divisions 1-8: List of Planning Scheme Maps (
166kb)
Part 10 Schedules
-
Division 1: Standard Drawings (
90kb)Division 2: Separate Development Legislation (
116kb)Division 3: Special Facilities (
111kb)maps Division 4: Designation of Land for Community Infrastructure (
164kb)
Appendices
- Appendix 1: Integrated Planning Act 1997: Schedule 8 (
120kb)
