Reservoir supply valve replacement

Scheduled construction work will be undertaken by the City of Gold Coast to replace the supply valves in the City’s water supply network. The construction work will take place in multiple locations throughout July 2019 and up until January 2020.

Hours of work

7am to 5pm Monday to Friday excluding public holidays

Public impact

  • construction presence – traffic and noise
  • temporary water shutdowns may be required and affected residents will be advised in advance.

Areas affected

Location Suburb Division Duration Reference
Reservoir OX3
Pacific Pines
Highland Park
High Ridge Road
McKenzie Drive
5 3 week period between July 2019 and January 2020. 73809636, 73809334
Coolangatta
Currumbin
Rutledge Street
Crest Drive
14 6 week period between July 2019 and January 2020
3 week period between July 2019 and January 2020
73809618, 73809393
Elanora
Reedy Creek
Doubleview Drive
Old Coach Road
13 3 week period between July 2019 and January 2020 73809591, 73809432
Coomera Days Road 1 5 week period between July 2019 and January 2020 73809576, 73809449
Mudgeeraba Tarrant Drive 9 4 week period between July 2019 and January 2020 73809565, 73809471
Burleigh Heads George Street 12 3 week period between July 2019 and January 2020 73809531, 73809489