Gully Pit Conversion Program 2020–21

Commencing: November 2020
Completion: June 2021
Cost: $172,900

As part of our annual Gully Pit Conversion Program, the City of Gold Coast is upgrading a number of gully pits across the city.

Gully pit upgrade works are required to ensure our bicycle routes are safe and that an acceptable standard of drainage infrastructure is maintained. We have identified gully inlet grates along existing bicycle routes that are hazardous to people on bikes.

Construction details

  • The 2020-21 program will encompass 26 priority sites, refer to location of works table below. The sites are located in residential areas and some high traffic roads.
  • These works are considered low impact and low risk and are expected to be completed in just a few hours at each site (weather permitting).
  • Traffic cones and generic road works signage will be used to safely cordon off the area.
  • Local residents may notice some temporary construction noise and minor disruption in some areas. Pedestrian management may be required at some sites.
  • Property access will be maintained at all times and construction notifications will be delivered prior to the works commencing.
  • At times there may be single lane closures, which will be managed by traffic control.
  • Some works will involve the use of heavy machinery including, but not limited to, excavators and concrete trucks.
  • To minimise impact on surrounding residents, works are proposed to be completed during normal working hours, being Monday to Friday between the hours of 7am and 5pm.

Location of works

Closest Street No. Street name Suburb Scope of work
179 Heeb Street Ashmore Replace grate & frame only
168-172 Heeb Street Replace grate & frame only
402 Benowa Road Benowa Replace grate & frame only
281 Benowa Road Replace grate & frame only
6 Rio Vista Boulevard Broadbeach Waters Replace grate, frame & lintel
102 Imperial Parade Labrador Replace grate & frame only
259 Rio Vista Boulevard Mermaid Waters Replace grate, frame & lintel
260 Rio Vista Boulevard Replace grate, frame & lintel
386 Rio Vista Boulevard Replace grate & frame only
  Markeri Street, Cnr Greenwich & Markeri St opposite roundabout Robina Replace grate, frame & lintel
17 Limetree Parade Runaway Bay Replace grate & frame only
19 Limetree Parade Replace grate & frame only
82 Limetree Parade Replace grate & frame only
90 Limetree Parade Replace grate & frame only
101 Limetree Parade Replace grate & frame only
5 Benowa Road Southport Replace grate & frame only
9 Benowa Road Replace grate & frame only
47 Benowa Road Replace grate & frame only
48 Benowa Road Replace with new kerb inlet unit

Community benefits

  • Improved community safety around stormwater gully pit structures
  • Gully pits compliant to current Australian standards

Click to enlarge

More information

For more information contact the Project Manager on 07 5667 3666.