Minor culvert renewal annual program

The City of Gold Coast maintains over 2500 kilometres of stormwater drainage with an ongoing upgrade and renewal program. We will be renewing culverts (under-road stormwater drainage pipes) throughout the city that are close to the end of their serviceable life. These works are part of our $23 million stormwater drainage annual capital works program.
Location of works
Approximate location | Suburbs |
---|---|
27 Rocky Point Road | Steiglitz |
53 Rocky Point Road | Steiglitz |
133 Holmstead Road | Steiglitz |
Corner of Short Cut Road and Holmstead Road | Steiglitz |
658 Norwell Road | Norwell |
217 Ageston Road | Alberton |
Construction details
- The existing under road drainage pipes are to be excavated and replaced with new pipes.
- Works are expected to take approximately 5 - 10 days at each site.
- We will be working to ensure disruptions are kept to a minimum. However, local residents may experience construction noise at times.
Benefits for the community
- Improve safety for the community.
- Reduce the risk of over floor flooding in catchment areas.
More information
For more information contact the Project Manager on 07 5667 3886.
- Libraries
- Media Centre
- Find a park
- Alerts
- Find a waste centre
- Report a problem
- Contact us
- Forms & applications
- Events
- Have your say
- Payments
- Permits & licensing
- Disaster management
- Community Directory
Trending pages