City of Gold Coast

Navigation Search
Back 

Installation of water and sewerage switchboards

Project duration:
25 February 2019 to 30 June 2019
(weather permitting)

Hours of work:
Monday to Friday 7am to 5pm
Saturday 8am to 3pm

Ref. 72729055

Project details:
The City will be undertaking work to replace of a combination of sewer and water pump station switchboards at multiple sites throughout the Gold Coast. The works are for the installation of a new sewerage pumping station switchboard and associated site works to meet current AS3000 standards and provide a safe site. Site remediation, as required, will be undertaken upon completion of the works.

Public impact:
On occasion the works will create noise and there is the possibility of dust and odour. Due to the site location, it is not anticipated that local businesses/residents will be affected during these works. Full access to properties will be maintained throughout the works. Possible noise from temporary generator to adjacent properties during switchboard works. All generators utilised are to be silenced. There will be no service interruptions.

Areas affected:

Suburb Division Streets affected
Ormeau 1 Goldmine Road
Yatala 1 Old Pacific Highway
Nerang 5 The Domain
Runaway Bay 3 Mount Hagen Drive
Worongary 9 Rushworth Street
Highland Park 9 Armstrong Way
Tugun 14 Cnr Cangella Court and Mirreen Drive
Elanora 14 Simpsons Road

Related information

Back  Return to top