City of Gold Coast

Navigation Search
Back 

Pimpama to Coombabah recycled water main augmentation

Commencing: July 2019
Completion: March 2020

Project information

The City is upgrading the recycled water pipeline from Pimpama Sewage Treatment Plant (STP) to Coombabah STP.

This pipeline will span 1.66 kilometres and will be constructed within an existing easement through the Lakeside Country Club. The augmentation will consist of the construction of an 800-millimetre diameter recycled water main pipeline to Coombabah Sewerage Treatment Plant.

These works are an important component of a larger city-wide project which will increase the capacity of our excess recycled water release system, to keep up with future population growth and subsequent increased demand on the network.

Public impact

Extended works at Lakeside Country Club from 2 August to 1 September 2019

Works within the Lakeside Country Club to will be undertaken from the 2 August to 1 September 2019. During this period extended works will be required to include Monday to Sunday between 6am and 6pm. On occasion the works may be required to be extended to 10pm. The golf course will be closed during this period.

Areas affected

Suburb Division Streets affected Reference
Coombabah 2 and 4 Gold Coast Highway, Brisbane Road
Shelter Road and Lakeside Country Club
68413925

Extent of works

Download the detailed Locality plan (PDF 397kb)

For more information on recycled water please visit the Recycled water page.

Related information

Back  Return to top