City of Gold Coast is constructing new water mains at the below locations as part of the infrastructure renewal program.

Works will be carried out in three stages:

  • pipe laying
  • reconnections
  • restoration.

During the reconnection stage, temporary water shutdown will be required and affected residents will be advised by notification letters.

Public impact

It is expected that the work will produce construction noise, dust and will impact local traffic conditions. Partial road closures may be necessary and motorists and pedestrians are urged to follow the direction of traffic control officers on site.

Areas affected

Suburb Division Streets affected Project duration Reference
Nerang 5 Klein Court and Colrene Drive 6 January 2020 to 14 February 2020 75233740, 75225996
Helensvale 2 Discovery Drive 13 January 2020 to 21 February 2020 75233726, 75234104
Helensvale 2 Mildura Drive 31 January 2020 to 28 February 2020 75485400, 75481189
Mudgeeraba 8 Tarawara Ave 14 February 2020 to 13 March 2020 75498757, 75486215